Aurangabad · since 2009

Built to last decades, not seasons.

Renovation, biogas, and engineering-first construction in Aurangabad. Bathrooms, kitchens, full-home renovations, biogas plants and industrial projects — under a single, accountable team.

Vedh — engineering crest
Since 2009 · Aurangabad · 1-year workmanship warranty · 80 m³ biogas plants delivered

Services

Five disciplines, one contractor.

Plumbing, electrical, civil, fabrication, finishing — under a single project lead.

Bathroom — flagship

Why our bathrooms last 20 years.

Our 7-layer waterproofing — refined across hundreds of bathrooms — turns water from a slow assassin into a non-event.

Vedh's 7-layer bathroom waterproofing system Cross-section of a Vedh bathroom floor showing each layer from RCC slab up to tile finish, with real-world thicknesses and a coved fillet seal at the wall corner. 8 mm 5 mm 25 mm 0.2 mm 1.5 mm 0.2 mm 100 mm+ WALL 8 1 3 5 7 FLOOR · CROSS-SECTION
  1. 1. Tiles 8 mm
  2. 2. Tile adhesive bed 5 mm
  3. 3. Protective screed 25 mm
  4. 4. Second primer 0.2 mm
  5. 5. Waterproof membrane 1.5 mm
  6. 6. Bonding primer 0.2 mm
  7. 7. RCC slab (substrate) 100 mm+
  8. 8. Corner fillet seal perimeter

Hover or tap a layer to inspect.

Vedh's biogas plant schematic Flow from feedstock through digester, moisture trap, H2S scrubber, blower, flow meter, flame arrestor, and end-use stove or generator. Biogas: 60% CH₄ · 40% CO₂ · trace H₂S CH₄ 60% Feedstock Cattle dung · food waste Digester 1–80 m³ · fabric balloon Moisture trap Removes condensate H₂S scrubber Strips corrosive sulfide Blower Pulls gas through chain Flow meter Measures m³ per day Flame arrestor Backflash safety End use Stove · generator

← scroll to explore the full system →

Engineering DNA

Our craft started with biogas.

Vedh started as a biogas turnkey installer in 2009. Plumbing, electrical, gas-handling, civil, fabrication — every renovation skill we have was earned shipping institutional biogas plants up to 80 m³.

Selected work

Recent projects.

Bathrooms, kitchens, biogas plants, industrial canteens — case studies as we publish them.

How we work

Four stages, no surprises.

  1. 01

    Recce

  2. 02

    Itemized estimate

  3. 03

    Build with 40/40/20

  4. 04

    Handover + 1-year warranty